Wednesday, June 25, 2008

Work Like An Egyptian




Remember all those neighbors we were going to recruit to help us lift the first wall with the really heavy header for the 16' radius eyebrow dormer? Well nobody was going to be home Sunday, sooo..Ed started thinking about plan B. Finally he says to me on the phone,"If the Egyptians could build the pyramids, I should be able to think of a way to raise this thing up by myself."







So Sunday morning, he got up and finished building the wall. I could see him up there just staring at the darned thing, and I don't dare make a sound because I don't want to break his concentration. He's seeing the whole thing play out in his brain first. Finally he gets a steel cable and starts hooking it around the top of the header. Then he took a ..oh I dunno.. 2x10"? board, held it up vertically, and took the cable over the center to hold the cable up higher than the forklift prong on the tractor, and tied off the cable to the forklift prong. Ok now here's the cool part. He comes down the ladder and says. "I'm pretty sure this will work." He gets up on the tractor and starts ever so slowly backing up.
















Now go way back... the movie 2001 Space Odyssey..at the very beginning when the pre-human manages to make a tool, and the monolith comes rising out of the ground. The drums are pounding,, DUM DUM, DUM DUM, DUM DUM, DUM DUM,,, I can hear that music in the background as Ed is inching the tractor backwards...

The tractor is inching further, the drums are getting louder DUM DUM, DUM DUM, DUM DUM , DUM DUM , the orchestra comes in .. Dee Dee Dee.....DEE DEE.. the center board comes to the upright.. Ed keeps moving every so slowly..

The brace board fell over just like it was supposed to. Now I can't decide whether to close my eyes and wait for the crash, or to keep taking photos. Just like a witness to any crisis, I stand staring with my mouth open. Not that I doubted for a minute, of course! More drums... DUM DUM, DUM DUM, DUM DUM, DUM DUM,,,the orchestra reaches a crescendo.. well.. you all saw the movie.. you know how it goes..





Then we got up on the roof..er..floor.. and inched it over to the edge and nailed it down. It really felt like a milestone.


The following day Ed started on the front wall. We also snapped out the interior walls, and came to a suprising realization. The windows front and back will be 4' off the floor, making any kind of view minimal, if not impossible. Since we'll be living in the apartment for 2 years while the house is under construction, this could be a bit claustrophobic. We may have to revise the plans a bit to include a balcony off the back like we will have on the house. Fortunately, the building department here isn't difficult to work with, and we don't expect a problem with the revision.

Ed finished framing the front and back walls, and since they were much lighter than the back wall, we were able to just lift them into place. It felt really good to be able to see such tangible evidence of all of Ed's hard work.
Here's a little known fact.. if you're 15' up in the air, and the wind is blowing like crazy across everyone else's pastures... all the pollen goes right in your face. Go figure. But the sunshine felt wonderful all three days, there was no rain, nobody fell off the roof, and Ed built the pyramids, so who can complain?

Wednesday, June 18, 2008

Good Day Sunshine












At last...no rain to speak of for three days! Mist doesn't count. Sunday Ed started by taking off the old plywood he temped up for protection from the wet. He spent the rest of the day putting the new plywood subflooring down. Now, kids, don't try this at home, because you could actually decapitate yourself, but he triangled the plywood on the forklift bars of the tractor and lifted them to the roof, being very careful not to tip the pile toward himself. If it slid off...well let's just say that the backhoe would be digging a trench somewhere down by the pasture for the funeral. I maintain a calm and serene facade while watching him do this stuff, screaming on the inside. Ed is very careful and is very good about moving stuff with the tractor but it's still scary to watch. Once the plywood was lifted more or less parallel to the subfloor, he went on top and pulled it to the building, glued and nailed it in place. Oh yeah, it's tongue in groove too, so he would get it set more or less in place and then do the Plywood Shuffle which consists of jumping on it with both feet while pushing forward with your feet to shove it together. For a guy that doesn't dance he did an amazing job! By the end of Sunday he had about half of the floor down.



Monday morning gave us another good weather day, so bright and early, Ed was back at it. He finished laying the subflooring and nailed it off. Yea! It felt like a milestone, mostly because he had been thwarted by the weather for weeks. **Note to self: When it's really windy and the compressor hose gets wrapped around the ladder...it can fall right over. Then you're stuck on the roof until a neighbor drives by, which out here can be a while!** In any event, Ed put up the last rim joist and began laying out the double curves for the eyebrow dormer. Who knew all that math we had to choke down in high school would finally come in handy? Good thing Ed remembers it all, because I would be lost! It was nice though to stand up there and look around. The view that we will have from the garage studio and the balcony on the house is going to be spectacular. In the summer all the trees and the pasture are green and lush. In the winter when the trees are bare, we will have a clear view of both pastures and the creek. We may thin some of the trees in the forefront to give a more clear view of the pastures. This is the southwest view. Out the north windows is a row of sugar maples that are stunning in the fall.


Tuesday morning was drippy and drizzily...not really rain, just enough to make us nervous. Ed and I went through the bundles of lumber still sitting in the driveway, and sorted them out. The pre-primed pieces and the cedar went in the garage, and we put the 2x4s and 2x6s in separate piles. After that, Ed started laying out the framing and working on the header for the eyebrow dormer. Now what shows here is one layer of the header. He made two more sets the same and puts them all together. You'd think by this time I'd be used to seeing Really Heavy Things, but I'm not. Next weekend he'll build the first wall, attach it to the header. Then after bribing as many male neighbors as possible, they'll lift it up and get the first vertical wall in place!

Friday, June 13, 2008

Catch-and-Release Construction




Another weekend fighting the weather. The weather guy (whom I have learned not to trust) said this is the coldest spring in 60 years. Not to be daunted, we forge on.


Sunday afternoon we started lifting the floor joists up. Remember the rim joists? The grunting..the groaning..the occational profanity? Apparently that was just the warmup. Ed leaned a ladder against the front of the garage, shouldered up one end of the floor joist, and with me ineffectually pushing from the far end, he hauled each one up to the rim of the garage, then pushed it toward the inside until resembled a teeter-totter. You remember teeter-totters.. how if you played on one with your older brother he always thought it was funny to jump off and let you slam down to the ground? Yeah, well..that was what we tried to avoid. Ed would push it forward until it balanced on the rim of the garage, hand it off to me to balance while he ran inside the garage, set up the rolling staging just under it and would yell, "Let it go..I'll catch it." So I let go and prayed there was no subsequent screaming. Then I would run inside the garage, climb up another ladder and help balance the floor joist while Ed muscled it up the opposite side and nailed it off. Amazingly there were no traumatic injuries. And that's a good thing because it's really a long way to the hospital. We did that twenty times in the next two days.

Ed then put the rim joist on the front of the garage. That was pretty much a repeat of last weekend. Since Tuesday was scheduled for rain, he covered the floor joists with some old plywood as temporary protection and we called it a weekend. This next weekend is supposed to actually look like June, and we expect to get the plywood subflooring down.

Wednesday, June 4, 2008

All Jacked Up



Not much to show for this week. Ed worked half of Sunday and all of Monday on the building, but much of what he did was "invisible".


Sunday he nailed off the front sheering, and God forbid anyone ever try to take that plywood off because there are a hundred gazillion nails in it now. Then he put in sheetrock ledgers on the headers. That became vital for Monday when we put up the rim joists.


Now I didn't know what a rim joist was. At breakfast he says "I'll need your help to lift the rim joists up today." Always willing to help, I just smiled and said "OK" . "They only go up on three sides", he says. I'm thinking, "No problem.. I can do three boards. How hard can that be?"


Let me begin by saying that these things are like gluelams. They're plywood glued together to 1 1/4"x16"x17' .. yes, 17 F E E T . The glue they make them with, apparently made out of lead because they weigh a ton. Did I mention we needed to put them 10' in the air on the rim of the garage, hence the name rim joists? Grunting (Ed) and groaning (me) we managed to hoist those things up, then eeever so gently tilted them on edge, and Ed nailed them in. Actually once we figured out how to do it, except for more grunting and groaning, it went pretty smoothly.


Several of the existing walls had low spots so Ed decided to jack up the wall and level it out. I'd seen him jack up a whole house before so I had an idea how he was going to do this, but it always amazes me that a little tiny jack can be such a powerhouse. He jacked up the top plates and put in extra studs. The rim joists were nailed off and secure. At 5:30 it started to rain in earnest and Ed had to quit for the day.
Monday night into Tuesday we got 1/2" of rain and it didn't let up all day Tuesday. Bummer. The long range forecast is calling for decent weather next weekend. The plan is to get the floor joists up and plywood down across the floor. Of course that forecast is subject to change at a moment's notice.

Wednesday, May 28, 2008

Building in Slow Mowtion





Ed has been trying to do all things all the time, and keeping up with all the stuff that has to be done has been a frustration. The growth has exploded. Just take a look at the trees in the first entry pictures, and the ones a week later. Needless to say, the 15 acres of pasture were in dire need of mowing. What Ed wants to be doing is building. But since I'm too much of a wimp to learn to drive the tractor, Sunday after church, he took time out to do it. 6 hours on Sunday and 6 Monday morning took care of it. He did have company.. a pair of nesting ravens took advantage of the all-you-can-eat buffet that the brushhog turns up, and low and behold, the king of the sky showed up for dessert. He's been hanging around in a dead tree next to the pasture. With any luck he'll decide to move in permanently.






After lunch (Ed's, not the bird's), it was back to the garage. The first order of business was to rip off the old siding, put up 5/8"plywood for earthquake sheer, and drill holes in the existing foundation for tie-downs. Fortunately the existing foundation is sufficient for the second story addition. After the holes were drilled, Ed attached some plastic tubing to the compressor and blew out all the cement dust.





He shot the epoxy in each hole and sank the bolts, then installed eight of these super-duper tiedowns. And that's just the north side. These will go all around the foundation. Between the plywood going inside and out, and the tiedowns, this baby isn't going anywhere. At the risk of tempting fate, when Mt. Ste. Helens blows, we may have the last standing building along the Columbia. Seriously, after going through the Loma Prieta Quake in '89, there is no such thing as overbuilding for a major seismic event.
Once that was done, he marked out the top plates for the rafters and nailed those up. Next week the weather is supposed to be pretty good (subject to change at the drop of a hat) and Ed expects to be able to put up the rafters and the plywood flooring. That's the point that it will feel like the project is moving forward.

Wednesday, May 21, 2008

Keeping your head(er) on straight






First a little housekeeping.. for those of you who tried to pull up the website for the barn, one teenie extra punctuation mark can really mess stuff up.. it's actually http://www.unclehowards.com/ I goofed and put in a parentheses where it shouldn't have been. And for the curious, here's a picture of the barn.




Ed is still working on demo on the garage. He said it feels like it's taking forever. But it's out with the old and in with the new. He finished taking out all the old roof joists, took down the garage door opener, and unhooked the electrical on Sunday.



The inside of the garage looks pretty weird without a roof. I keep opening the garage door and being surprised. Plus I've gotten used to storing stuff there...charcoal, extra chicken feed, you know..stuff. Now it's either wet, or relocated and I can't remember where it is.


Monday morning, after some manuevering, Ed figured out how to lift a gazillion pound gluelam header up all by himself. Now you know and I know that he's not called Big Ed for nothing. All that time in the gym comes in handy, but I was a little doubtful. Fortunately he has more than muscle between his ears. He rigged up some 2x6s and chain to the tractor forklift..the boards were notched to keep the chain from slipping down..and eeeever so slowly hoisted that baby up smoooooth as butter! It was pretty amazing!

Tuesday the game was called for rain, so we drove into town for supplies. The bad part is that we're an hour from a town of any size and it takes forever. The good news is..we're an hour away from a town of any size. Anyway between driving and the rain, it pretty much shot one day. Next weekend construction may be pre-empted by mowing. The grass in the pasture is getting so long the dog has to jump up to see where she is. Maybe we should just get sheep....








Wednesday, May 14, 2008

Long journeys begin with the first step.


Welcome to the first entry of what I hope is a fun experience. My motto has always been "If you can't have fun at work, you might as well not show up". This ought to carry through just about everything, with the possible exception of hitting one's toe with a flooring hammer. I have it on good authority that that's not worth showing up for. The main objective will be to share our building experience, and to have a good time.
By the grace of God and dumb luck, we found the dream property. Forty acres with a creek, a little valley and a pre-existing 3 car garage, and a decent double-wide. The view off the back is spectacular. It has a good well and the house site is well above the flood zone. Wo Hoo! Elk and eagles abound. Deer, coyotes..and it's too wet for rattlesnakes! A big deal for two kids who grew up in the desert.
Ed and I moved to southwest Washington on Thanksgiving day 2005. After a 15 hour drive from Santa Cruz, California (yes, more of those dreaded Californians) we arrived tired and excited with a dog, two really irritated cats, a pickup truck loaded to the gills, towing a trailor with the beloved but neglected Boss 302 Mustang. We looked like an ad for a Steinbeck movie.
Fortunately only the most important stuff we owned was in cardboard boxes in the truck. The rest was due in a week via moving van. Did I mention it was raining? Of course it was! The cardboard was not happy.
We've cleared acres of blackberry vines, some with canes the size of small trees. They were so thick in places it completely hid the hulk of an old pickup truck. Only when we got the old vines beaten back and a scrap metal hauler in to remove it did we discover the hay baler behind it! The darned vines were so thick you couldn't even see it! We hauled 24 old tires to the dump, and removed miles of barbed wire cross fencing. Man, that's nasty stuff! With that done, Ed built a beautiful barn ( http://www.unclehowards.com/) with the help of family, friends, and neighbors. Yes, a good old fashioned barn raising! Do you have any idea how many smoked ribs and potato salad it takes to feed 12 ravenous guys? Well.. it's a lot!
Last summer was the Septic Summer. Ed updated and expanded the septic system in anticipation of starting the real building project. which is.... Taa Daa .. http://www.robinsonplans.com/

Since we already have the existing garage and a spectacular view off the back into the valley, we decided to build the house and garage side by side instead of in an el as shown. The garage studio will be first. We will live in the studio above while we build the house. and yes,
Ed will be building it by himself.

And so it begins. We were waiting for it to stop raining so we could start construction. AHAHAHAHAHAA It's Washington. It rains here all the time. Actually that's a well-cultivated lie. The weather here is amazing...but I digress. Ed has started ripping off the roof of the garage.
Thank goodness for the tractor. What a workhorse!





The twins, Midnight and Mittens are functioning as union stewards. They use every opportunity to check out the job site. They don't seem to be bothered by the noise of the tractor, the nail guns or the compressor. They just won't wear the darned hardhats!
Ed is only home three days a week to work on the house, and it kills him when the weather gets in the way. So he decided to just go ahead and rip the plywood off anyway and make good use of tarps for the stuff left in the garage. The lumber delivery is enroute and he wants to get the new header up as soon as possible. Ok and I'll just say this once.. I'm not doing the work, I'm just typing, so if I use the wrong term or call something by the wrong name..well.. nobody dies. Just take a breath, OK? So here's the first load of stuff .. wood, joists, gluelam, shingles, exterior wrap. It's kinda like getting all the stuff under the Christmas tree but not being able to open anything to play with it.
And to me, it's all a bit overwhelming. How does he know where all that stuff goes? Or how it goes together..or if something's missing? But Ed says it's just a whole lot of baby steps. Heck, I don't even know how to crawl! Guess I'll learn.