Friday, November 7, 2008

Santa Drives an Econoline Van

Sunday Ed worked all day trying to re-install the garage door opener, which had to come out last spring when the roof came off the garage. How come they never go back together as easily as they come out? Apparently the sensor eyes aren't working and we had to order a new one. Thank goodness for the internet! It'll come in the mail.




Monday morning we were waiting for windows like kids waiting for Santa. Although this isn't a huge house, somehow I was expecting a truck slightly larger than an Econoline van. Whatever works..









Eleven windows, a patio door, and the entry door. Those doors are heavy!


It started to rain (rains here all the time) so we decided to go into town to talk to the plumbing and electrical supply folks. That pretty much ate up the rest of the day. We got home in the dark..too late to take the cats down to the barn. Lucky them..they got to sleep in the house.



Tuesday Ed pulled all the windows and the sliding glass door up to the second story with a rope sling. I don't have a picture of that. I was too busy biting my nails, and besides Ed was really straining to pull that sliding door unit up by himself. Far be it from me to diminish that..it was darned hard. I got to help with the easy stuff. Ed built a temporary platform out where the balcony will be and we put the south windows in first.





The north windows went in much faster, mostly because there was a relatively secure place to stand while Ed was working (I got the inside part). Ed wants to keep the big central window open until after sheetrock is delivered. We'll probably order that next week.

No comments:

Post a Comment