We've had Mount Vesuvius in our front yard since the basement was dug a year ago. Most of the dirt went down into the pasture, but we still managed to keep quite a pile. Now that the bulk of the heavy delivery trucks have come and gone, we wanted to regain some semblance of a front yard. I've been trying to figure out what I want this area to look like, but it's tough to get the picture in my mind when there is a monster pile of mud in the center.
Fall and winter are the best times to plant trees and perennials, so Ed wanted to move the dirt around before the heavy rains start. The rule is:
" If there is sun, outside's the one. If it is wet, inside's the best bet."
Ok, it's a cheesy rhyme, but it's the best I could do in a pinch. Not only is the dirt heavier if it's soaking wet, but the tractor churns up the mud like a Cuisinart on steroids. It took two days to move the pile, and put it down on the road he's been working on. The first day was a nice day. The second day...not so much.
By the end of the second day, things were pretty wet, but most of the dirt was gone. We spent the afternoon picking up construction debris and loading it into the truck. We then made the second dump run in a week.
Now I can start planning! I see a kousa dogwood tree, a few small Japanese maples, some small lavender, rhodys...whatever the deer won't eat.
Once the rains started, Ed moved back inside. The fireplaces will be installed tomorrow. Ed finished framing the upstairs fireplace.
He also had to re-work the framing in the east bathroom. Because the plans showed no route for the HVAC ducting, we had to improvise. Some of it came up through the upstairs bathroom which completely changed the configuration of the bathroom. To retain the elements we wanted, ie, double sinks, we decided to take out the linen closet, put the sinks where the linen closet was going to be, and use an antique armoire for the linens instead. In practical terms, this meant, Ed had to rip out some framing that was already completed and re-do it. In mental terms, it was like removing a tooth with pliers. But once he made the decision, he went right to it. It'll be perfect.
He had some other details to complete upstairs, such as finishing the final pieces of fire blocking.
He also had to frame in attic access panels in each upstairs closet, and one from the east upstairs closet to access the attic over the craft room. I'm not sure why these are code. I'm sure there is a logical reason...I'll let you know if I think of one.
The good news is, tomorrow I fly south to visit family for a few days. The bad news is, the fireplaces will be installed tomorrow and I'll miss it. Hopefully Ed won't be too busy to take some photos. I'll only be gone for a few days, but things have started happening at a rapid pace.
Glorious!
-
The geode sidelight was installed last month. A special shout out to my
husband for the installation. I did get the hint however that he would
rather no...
8 years ago
No comments:
Post a Comment